PhilaDur PHE 06/02 Glasscoat

Overview

PhilaDur PHE 06/02 High Solids Glasscoat Ice Coating is a unique high solids volume epoxy aluminum shield primer (with glass flake) with excellent abrasion and corrosion resistances. It has universal coating ability at low temperatures down to -6℃. It is also suitable with controlled cathodic protection systems. It offers high quality durable protection, elasticity and impact resistances. A two component, high solid, glass flake reinforced epoxy coating: Applicable by one coat for C4 t/m C5 – IM3 according to ISO 12944. Excellent barrier properties, abrasion resistance, and resistant against a wide range of chemicals  Applicable under severe circumstances i.e. splash zone, etc. Easy to apply in high range of film thickness by one coat, up to 500 µm Application: in aggressive industrial and marine environment. Note: when exposed to sunlight, the coating will chalk.

Purpose

PhilaDur High Solid Glasscoat PHE 06/02 is used as a universal high build primer under/above sea water line. It is used for heavy marine, industry, and offshore applications especially: Car Ferries, Garage Decks, Crude Oil Tanks, Ballast Tanks, and Cargo Holds. It is suitable for refined spirits, please consult with our technical advisor for more info.

Properties

Sheen: Semi-Gloss

Color: Grayish, Reddish

Solids: 92 ± 2

Coverage: Theoretical Coverage: 6.13 sq. m/lit at 150 microns dry / 160 microns wet

Thickness: Over 150 microns dry, also suitable for 500 microns per coat

Flashpoint: Base 45 °C, Hardener > 70 °C, Thinner PH 300 23 °C

VOC: 122.00 g/lit (material as into the container)

Application Data

Mixing Ratio: Basis 8,3 part/weight, Curing Agent 1,7 part/weight

Thinner: Not recommended. The material is ready for use, under special conditions use Thinner for Epoxy PH 300, max 5% by volume.

Painting Method: Airless spraying is our recommendation, brush, and airless-spray follows. Tip range 0.48mm-0.53mm (21 thou), blowing pressure shouldn't be less than 170-200kg/cm2 (2000psi). Additional thinner may be required. Proper equipment is necessary. Optimal application conditions: Temperature 15 – 25°C, Humidity 40 – 75% Actual safety measures and precautions are very important from the selected method and environment work. Emergency Contact Numbers are available world wide upon request.

Cleaning: Power tool cleaning and Cleaners with Thinner for Epoxy PH 300.

Readiness Time: 15 minutes in an ample temperature.

Pot Life: 20 litre packing appr. 90 min. at 10 °C, appr. 45 min. at 20 °C

Curing Time: Within 7 days at 23℃ (fully cured).

Drying and Over-Coating Conditions

PhilaDur PHE 0602 Glasscoat.JPG

Coating Specification

If local temperatures are around freezing, there is a long overcoat period. The systems, actual existing film esp. overcoated epoxy layer, proper surface preparation, and coating application procedures should be selected, and then tested in a controlled laboratory. Design factors, statements, and specific recommendations should always be valued. Always factor in conditions and remain in touch with Phila Coatings (USA) Inc. Technical Department.

Surface Preparation

All surfaces should be clean, dry and free from contamination. High-pressure fresh water wash should be applied prior to the treatment of the application. Steel products with mill scale: shot blasting or grit blasting should meet the requirements of Sa2 grade in Sweden derusting standard at least. Steel products without mill scale: to be ground by dynamic tools to meet the requirements of St3 grade in Sweden derusting standard. Steel products painted with plant primer: use slight grit blasting or dynamic tools to carry out secondary surface preparation to meet the requirements of St3 grade in Sweden derusting standard. For other surface treatments, please consult with Phila Coatings (USA) Inc.

Storage

Circa 24 months at 20°C, stored at dry, shaded and ventilated condition. The container/paint, must be kept sealed and away from heat and ignition.

Pack Size

Basis 4 Gal. (16 Lit) drum, agent 1 Gal (3,785 Lit) drum. If other packing specifications are needed, please consult with Phila Coatings (USA) Inc.

Health and Safety

Prior to use, obtain, consult and follow the Material Safety Data Sheet for this product concerning health and safety information. Read carefully and conform to precautions on MSDS and packing vessels. To avoid eye and skin contact, tools such as gloves, goggles and face mask etc. should be used during work with product (proper safety measures should be taken according to construction methods and circumstances). All work with the product must be carried out according to all relevant national health, safety and environment standards and codes. This product is for professional use only.

Limitation of liability

All information is given for guidance only and is subject to regional variation depending upon local climate and environmental condition. An excessive film thickness delays the final curing and creates sagging. Over coating interval will increase with the number of paint layers and the thickness of the paint film. For recommended paints at special circumstances, please consult with our Phila Coatings (USA) Inc. Apply in good weather. The relative humidity must not exceed 80% temperature of the surface to be coated must be at least 3°C above the dew point. All data from the tests is obtained under lab conditions, so Phila Coatings (USA) Inc. won’t bear any liabilities from the condition whether the data could reflect the objective status of the actual application circumstance or not.

Disclaimer

The information in the product manual is based on our experiences from tests and practice. For the application without our knowledge, we could only make sure that our products themselves are warranted. We may modify the data in this product manual according to our continuous development and experience accumulation without advanced notice.